Loading...
Checkoff Sheet MS-2015-0759.tif i I REROOFINGAL CODE' 2009 INTERNATIONAL RESIDENTI CITY OF BLAIR F SHEETo Return to Mair City. Mall prior t® Final in pection zee i6 6 street, Blair, NE , because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work,please indicate compliance with the following requirements EgU2MdM this reroofing job. Property Address: t Contractor or Homeowner(if self) Permit 4. ., . Installation Date: i YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907,1) ICE PROTECTION INSTALLED,An ice barrier that consists of at least two layers of underiaY meat or of a self-adhering polymer modified bitumen sheet was Installed and extends at least from the eaye's ed a to a point at least 24 inches inside the ex#erior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE s®UND.The structural roof components are capable of supporting the roof covering system and the material and equipment,loads that will be encountered during installation of the roof covering system. (89072) EXISTING COVERING WAS REIUtOVED. Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RUSTED METAL OR l LASHING. Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted, (R907,5) PLASHING INSTALLED PROPERLY. dashing shall be reconstructed in accordance s installation Instructions, Metal flashing to which with approved manufacturer' bituminous materials are to be adhered shall be primed priorto Installation.-(R907.6) Si nature Prl install r to . � ate Signature af..Permit-Hol`der