Loading...
Checkoff Sheet MS-2014-00593.tif 2-009 INTERNATIONAL U- IDETIAL. GODE C I°I i OF BLAIR REROOFINGCHECKOFF F H T Return to Blair City Mall prior t0 Final Inspection 218S16 1hStreet, Blair, NE 68006 Because of limitations caused by the infeasibility to perform detailed inspections which would nal interfere with reroofing work, please indicate compliance with the following requirements following this reroofing Job. (� Permit#: t`?"` I Installation Gate:._.♦� Y No The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.7) LCE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of undedayment or of a self adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components mp nems are capable of supporting the roof covering system and the material and equipment loads . ; that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing,metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED ST ED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.5) < 17 Sign6jiP6 of Pr' ary lnstailer Date i r i Signal, of Permit Holder Date