Checkoff Sheet MS-2014-00593.tif 2-009 INTERNATIONAL U- IDETIAL. GODE
C I°I i OF BLAIR REROOFINGCHECKOFF F H T
Return to Blair City Mall prior t0 Final Inspection
218S16 1hStreet, Blair, NE 68006
Because of limitations caused by the infeasibility to perform detailed inspections which would
nal interfere with reroofing work, please indicate compliance with the following requirements
following this
reroofing Job. (�
Permit#: t`?"` I
Installation Gate:._.♦�
Y No
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.7)
LCE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of
undedayment or of a self adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components mp nems are
capable of supporting the roof covering system and the material and equipment loads
. ; that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing,metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED ST ED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.5) <
17
Sign6jiP6 of Pr' ary lnstailer Date i
r i
Signal, of Permit Holder Date