Loading...
Checkoff Sheet MS-2014-02630.tif i 2`009 INTERNATIONAL RESIDENTIAL CODE ' CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16thStreet, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. f Property Address: Contractor or Homeowner(if self) : G�O A NIS (()r Jr t ( Permit#: MS-20 ' - Installation Data:. YES -NO L ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with.the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) Q STRUCTURAL COMPONENTS ARE SOUND:The.structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) U I� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, gollars or metal counter-flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance With approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) I� Signature of RhaplAfisttiffer D t Signature of Per ' old ate