Checkoff Sheet MS-2014-02630.tif i
2`009 INTERNATIONAL RESIDENTIAL CODE '
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16thStreet, Blair, NE 68008
Because of limitations caused by the Infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job. f
Property Address:
Contractor or Homeowner(if self) : G�O A NIS (()r Jr t (
Permit#: MS-20 ' -
Installation Data:.
YES -NO
L ❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with.the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
Q STRUCTURAL COMPONENTS ARE SOUND:The.structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
U I� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, gollars or metal counter-flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
With approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
I�
Signature of RhaplAfisttiffer D t
Signature of Per ' old ate