Loading...
Checkoff Sheet MS-2014-02725.tif Oct, 21. 2015 11 :39A No. 7568, P. 1 1 CITY OF 13LAIR REROOFING otum to lairi'ty. all prior to Final Inspection . 1 le treet, Blair, NE 68008 Eecauss of limitations caused by the infeasibility to perform detailed inspections which would not Interfere with reroofing work,please Indicate compliance with the following re uirements foUgzgM this reroofing job. 1''rparty Addr : �' �� Contractor or Homeowner(if self) : Permit#.. MS-20 = Installation Date: Yl NO l '-The materials and methods of application used for recovering or replacing tate existing roof covering comply with the requirements of the building code. (RS07,1) I� IDIS PROTECTION INSTALLED:An Ice barrier that conslafs of at least two layers of undsdaymant or of a self-adhering polymer modified bitumen aheet was installe and extends at least from the eave's,edae to a point at least 24 inches insido the exterior wall line of the building. (R906.2.7.1) - STRUCTURAL Ct711[PONENTS ARI:60UN17:The structural roof components are capable ofsupporiiitg the roof covering systern and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) 1xISTING COVE PdNa WAS PF-MOVED: Existing roof covering was removed for one of the reasons required by seotlon 1907.3 JDID NOT USE RUST1=p__W.9TAL Q FLASHING: l)dsting vent flashing,metal edges, drain outlets, pollars or metal counfer-flashing were not reinstalled if ru,5ted. (R907.6) ELAMI NG INSTALLED PROPERLY Flashing shall be reconstructed in accordance With approved manufacturer's installation insfructlons,Metal flashing to which �� lftt En materials are to be adhered shall be primed prior to installation.•(R907.6) jibSig afore o rimarytaller Da e Signature of Permit Molder pate