Checkoff Sheet MS-2014-01735.tif Oct, 21. 2015 10; 7AM No, 7564 , P. 1
ewuv
mi r.RNATIONAL RESIDENTIAL CUE
CITY OF I
Return to Blair City Hall prig to Final Inspection
218 S ,I6th treat, B(air, NE 68008
Isecauss of limitations caused Lythe infeasibility to perform detailed Inspections which would
not interfere wifth reroofing work,please indicate compliance with the following regulroments
following thls reroofing job.
Property Address;
4
/A.
Contractor or Homeowner(if self)
Permit 9: MS-20
Insfallatlort
YES NO
"'The materials and methods of applicator used for recovering or replacing the a)asting
roof covering comply with the requirements of the building cods. (R807.1)
ICE PROTECTION INSTALLED:An Ice batrler that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was Installs d and
wdends at least from tho eaye's-edae to a point at least 2�inches_inslda the ;terior
wall Prie of the building. (11505.2.7.1)
i
s-rPugI gm.r-omPONENTS ARE S UND:Thestructural roof component3 are
capable ofaupporting the roof covi Ong system and the material and equipment loads
thet will be encountered during installation of the roof covering system. (Rg07.2)
ExISTiNO COVEPJNO WAS REMOVED., Exlsfing roof covering was removed for one
of the reasons rewired by section 8007.3
Q DID NOT USE RUSTtl)METAL OR-�_.gHING:Existing vent flashing,metal edges,
draln outlets, gollars or metal counter-flashing ware not reinstalled if rusted. (111907.6)
FLAS14ING INSTALLED PROPERLY':.Flashing shall be reconstructed In accordance
with approved manufacturer's installation instructions.Metal flashing to which
bituminous materials are to be adhered shall be primed priorto lnstallatlon.•(R007,C)
Signature of Plemary Installer a
s
145 115
Signawr e o er bate
i
i
i