Checkoff Sheet MS-2014-01192.tif i
Oct, 21, 201%1 :1111M NoNAL RESIDENTIAL , 7565 L)E, P. 1
CITY OF 13LAIRREROOFING
Return to Blair City Hall prior to Final Inspection) .
218 8 le Street, Blair, NE 68000 .
because of limi€afions caused bythe infeasibility to perform detailed inspections which would
not interfere with reroofing work,please indicate compliance with the follovring requirements
following this reroofing job. I 1 r '
Property Address
I I 1`
Contractor or Homeowner(If sel€ ;
Permit;9:
Installation Date. 1
Y NO
l --The materials and methods of appiioation used for recovering or replacing the exIsfing
roof covering comply with the requirements of the building code. (8907.1)
®
ICK PROTI;Ct ION INSTAl.I, E1;An ice Barrier that consists of at least two layers of
underlayment or of a self-adheringpoIY mer modified bitumen sheet was installed and
extends at least from tha eavds-edga to a point at ioasf 24.Inches inside the exterior
wall Una of the building. (8905.2.7.1)
STRUCTURAL COMPONENTS ARF,�QUW The structural roof components are i
capable of supporting the roof covbAng system and the material arta equipment loads
that will be ancountered duffing installation of the roof covering system. (R907.2)
PASTING COVEPJNG MS REMOVED; Usting roof covering was removed for one
of the reasons required by section 8907.3
)DID HOT USE RU§T[!Q Ml~rAL OR FLASHING: 15xiating vent flashing, metal edges,
drain outlets,collars or metal counter-flashing were not reinstalled If rusted. (R907.5)
FLASHING INSTALLED PROPER4Y-Flashing shall be reoonsfruated in acoordanca
whLh approved manufacturer's installation Instructions. Metal flashing to which
'no aterials are to be adhered shall be primed prior to installation.-(R807.6)
Signature o,Prima In aII gat
Signature of Permit;-folder Date
i