Loading...
Checkoff Sheet MS-2014-01192.tif i Oct, 21, 201%1 :1111M NoNAL RESIDENTIAL , 7565 L)E, P. 1 CITY OF 13LAIRREROOFING Return to Blair City Hall prior to Final Inspection) . 218 8 le Street, Blair, NE 68000 . because of limi€afions caused bythe infeasibility to perform detailed inspections which would not interfere with reroofing work,please indicate compliance with the follovring requirements following this reroofing job. I 1 r ' Property Address I I 1` Contractor or Homeowner(If sel€ ; Permit;9: Installation Date. 1 Y NO l --The materials and methods of appiioation used for recovering or replacing the exIsfing roof covering comply with the requirements of the building code. (8907.1) ® ICK PROTI;Ct ION INSTAl.I, E1;An ice Barrier that consists of at least two layers of underlayment or of a self-adheringpoIY mer modified bitumen sheet was installed and extends at least from tha eavds-edga to a point at ioasf 24.Inches inside the exterior wall Una of the building. (8905.2.7.1) STRUCTURAL COMPONENTS ARF,�QUW The structural roof components are i capable of supporting the roof covbAng system and the material arta equipment loads that will be ancountered duffing installation of the roof covering system. (R907.2) PASTING COVEPJNG MS REMOVED; Usting roof covering was removed for one of the reasons required by section 8907.3 )DID HOT USE RU§T[!Q Ml~rAL OR FLASHING: 15xiating vent flashing, metal edges, drain outlets,collars or metal counter-flashing were not reinstalled If rusted. (R907.5) FLASHING INSTALLED PROPER4Y-Flashing shall be reoonsfruated in acoordanca whLh approved manufacturer's installation Instructions. Metal flashing to which 'no aterials are to be adhered shall be primed prior to installation.-(R807.6) Signature o,Prima In aII gat Signature of Permit;-folder Date i