Loading...
EL-2015-00286_0001 (3).tif BUILDING INSPECTION REPORT O BLAIR ❑ WASHINGTON COUNTY ❑OTHER LOCAT SPECTION: zI NAME OF OWNER: I I��� a m= ` � PHONE#: PERSON REQUESTING INSPECTION: ''❑ PHONE#: F-1 SET TIME DATE INSPECTION REQUESTED ❑ TIME INSPECTION REQUESTED: Q_ANYTIME PROJECT DESCRIPTION: 4 TYPE OF INSPECTION: ❑ IST INSPECTION RE-INSPECTION ❑ CONFERENCE ❑ STATUS CHECK BUILDING: ❑FOOTING ❑DECK FOOTING ❑FRAMING ❑DRYWALL ❑PARTIAL ❑FINAL PASSED FAILED PERMIT NO.: CONTRACTOR: RECORDED: _ El Elf UTILITIES: ❑SEWER TAP ❑SEWER ❑SEPTIC ❑WATER TAP ❑WATER SERVICE ❑PARTIAL ❑FINAL PASSED FAILED PERMIT NO.: CONTRACTOR: RECORDED: ❑ ❑ � ELECTRICAL ❑ROUGH IN ❑PERMANENT SERVICE ❑TEMPORARY SERVICE ❑PRE-CONNECT ❑PARTIAL LIFJNEIL PASSED FAILED PERMITNO.: 1 y CONTRACTOR: " RECORDED: ® 0 ❑ 4 MECHANICAL: ❑ROUGH-IN ❑A/C ❑ FURNACE ❑HEAT PUMP ❑FIREPLACE ❑ GEO THERMAL ❑RADIANT HEAT PASSED FAILED El PARTIAL —1 FINAL ❑ ❑ I PERMIT NO.: CONTRACTOR: RECORDED: PLUMBING: ❑GROUNDWORK ❑ROUGHIN ❑PRESSURETEST ❑PARTIAL ❑FINAL PASSED FAILED G PERMIT NO.: CONTRACTOR: RECORDED: ❑ ❑ r I' ❑OCCUPANCY GRANTED ❑CONDITIONAL OCCUPANCY GRANTED ❑911 SIGN ❑RETURN DEPOSIT ❑FORFEIT DEPOSIT d NOTES/REMARKS: k C { I I 1 � ,E A5HIN.GTOII CO.WIIVSI'EC A t,CITY INSPECTOR OR OTHER r a I DATE OF INSPECTION. e t �,r ❑❑ TIME 46, - EMAILED TO OPPD OR BCPPD ❑ DATE: INITIALS: