Loading...
Checkoff Sheet MS-2014-02883.tif 10/16/2015 10:57 4025718515 CONSTRUCT INC PAGE 01 2009 INTERIMATIUN I TY OF h Return to Blair City, Hall prior to Find Inspection 218 S 10 Street, Blair, NE 68008 Sscause of limitations caused by the Infeasibility to perform detailed InspGctlons which would no Interfere with reroofing work,please indicate compl[ence with the fbiloWIng requIrdments t'ollr�wina Chia reroofiin&b. Property Address-,2_`15L S 2220 c;4 gknk r /UC 69009 Contractor or Homo-owner(if sel' ; K Pormit g: MS-20 1(_L Installation Data: 1 YES.- NO EF r 13 The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building rzda. (R907.1) ( ICE PROTECTION INSTAL., ED; An Ice barrier that consists of at least two layers of underlayrnent or of a self-adhering polymer modified bitumen sheat was G7stalled and e)dands at le�ast f om the eave's edge to a point at least_ inches_InsCd the exterior wall Brie of file building. (R9Q6.2.7,'1) i STRU+CTURAI.C[ IVIpCNRITS ARt~S'OUID:Thi structural roof components are capable of sup'portitig the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system, (8907.2) f XISTiNG COVERING'I AS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USIA RUST D MI~TAL OR FLASHING Exlsting vent flashing,metal edges, drafsr'outlofs;-guHars or-metal caUrifer-flashing were not reinstalled [f rusted, (i 90 .5) FLASEiIhI+ INSTA�LI`D 1 R01?ER. �Flashing shall be reconstructed in accordance with approved manufacturer's Installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to€ns allatlon.,(R.g07.6) }r . SI bre of Primary Installer Dat ignature of permit Holder Gate