Checkoff Sheet MS-2014-02883.tif 10/16/2015 10:57 4025718515 CONSTRUCT INC PAGE 01
2009 INTERIMATIUN
I
TY OF
h
Return to Blair City, Hall prior to Find Inspection
218 S 10 Street, Blair, NE 68008
Sscause of limitations caused by the Infeasibility to perform detailed InspGctlons which would
no Interfere with reroofing work,please indicate compl[ence with the fbiloWIng requIrdments
t'ollr�wina Chia reroofiin&b.
Property Address-,2_`15L S 2220 c;4 gknk r /UC 69009
Contractor or Homo-owner(if sel' ; K
Pormit g: MS-20 1(_L
Installation Data: 1
YES.- NO
EF r 13 The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building rzda. (R907.1)
( ICE PROTECTION INSTAL., ED; An Ice barrier that consists of at least two layers of
underlayrnent or of a self-adhering polymer modified bitumen sheat was G7stalled and
e)dands at le�ast f om the eave's edge to a point at least_ inches_InsCd the exterior
wall Brie of file building. (R9Q6.2.7,'1) i
STRU+CTURAI.C[ IVIpCNRITS ARt~S'OUID:Thi structural roof components are
capable of sup'portitig the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system, (8907.2)
f XISTiNG COVERING'I AS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
DID NOT USIA RUST D MI~TAL OR FLASHING Exlsting vent flashing,metal edges,
drafsr'outlofs;-guHars or-metal caUrifer-flashing were not reinstalled [f rusted, (i 90 .5)
FLASEiIhI+ INSTA�LI`D 1 R01?ER. �Flashing shall be reconstructed in accordance
with approved manufacturer's Installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to€ns allatlon.,(R.g07.6)
}r .
SI bre of Primary Installer Dat
ignature of permit Holder Gate