Checkoff Sheet MS-2014-02746.tif i
INTERNATIONAL2009 i
CITY OF BLAIR REROOFING
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work,please indicate compliance with the following requirements
fo[lo�wina this reroofing job.
Property Address: Z
Contractor or Homeowner(if self).- C
Permit#: iVIS-2O1 - G"
Installation Date. ��2 s j l71 y
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code, (8907.1)
❑ ICE PROTECTION INSTALLED:An ice barrier that consists of at leas
underlayment or of a self adherin t two layers of
g polymer modified bitumen sheet was installed and
extends at least from the eaye s edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND:The.structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was remove o
of the reasons required by section 8907.3 d for one
DID NOT USE RUSTf=D METAL OR PLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation..(R907.6)
;Signature
ure of Prim In r j
Date i
o older
Date
i
i