Loading...
Checkoff Sheet MS-2014-02746.tif i INTERNATIONAL2009 i CITY OF BLAIR REROOFING Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work,please indicate compliance with the following requirements fo[lo�wina this reroofing job. Property Address: Z Contractor or Homeowner(if self).- C Permit#: iVIS-2O1 - G" Installation Date. ��2 s j l71 y YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code, (8907.1) ❑ ICE PROTECTION INSTALLED:An ice barrier that consists of at leas underlayment or of a self adherin t two layers of g polymer modified bitumen sheet was installed and extends at least from the eaye s edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND:The.structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was remove o of the reasons required by section 8907.3 d for one DID NOT USE RUSTf=D METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation..(R907.6) ;Signature ure of Prim In r j Date i o older Date i i