Checkoff Sheet MS-2014-02745.tif 2009 INTERNATIONAL RESIDENTIAL CODE'
CITY OF BLAIRREROOFING
Return to Blair City Hall prior to Final Inspection
i
218 S 16th Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
followin t
not interfere with reroofing work please indicate compliance with the g requirements
following.this reroofing job.
Property Address: l 23
Contractor or Homeowner(if self)
Permit tf: MS-20_/�L- -7 G S
Installation Data:
YES NO
i
® ❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with•the requirements of the building code. (R907.1)
❑ [CE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at(east from the eave's edge to a point at least 24 inches ins'[de the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND:The-structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
CY ❑ EXIST[NG COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 1907.3
Q DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
Signature of Primary sta r Date
5
Signatureof P Ider Date