Loading...
Checkoff Sheet MS-2014-02745.tif 2009 INTERNATIONAL RESIDENTIAL CODE' CITY OF BLAIRREROOFING Return to Blair City Hall prior to Final Inspection i 218 S 16th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would followin t not interfere with reroofing work please indicate compliance with the g requirements following.this reroofing job. Property Address: l 23 Contractor or Homeowner(if self) Permit tf: MS-20_/�L- -7 G S Installation Data: YES NO i ® ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with•the requirements of the building code. (R907.1) ❑ [CE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at(east from the eave's edge to a point at least 24 inches ins'[de the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND:The-structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) CY ❑ EXIST[NG COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 1907.3 Q DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Signature of Primary sta r Date 5 Signatureof P Ider Date