Loading...
Checkoff Sheet MS-2014-02349.tif 2009 INTERNATIONAL RESIDENTIAL CODE' CITY OF BLAIR Return to Blair City Hall prior to Final Inspection 218 � Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, p compliance lease indicate with the following requirements following this reroofing job. Property Address: Contractor or Homeowner(if self) : G G� Permit#: MS-20 Installation Date: I YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) Q ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R906.2.7.1) STRUCTURAL COMPONENTS ARE SOUND:The.structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) I� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, gollars or metal counter-flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's Installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) j Signature of Prim In ler Date A/ -5 Signature of P older Date I