Checkoff Sheet MS-2014-02349.tif 2009 INTERNATIONAL RESIDENTIAL CODE'
CITY OF BLAIR
Return to Blair City Hall prior to Final Inspection
218 � Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, p compliance lease indicate with the following requirements
following this reroofing job.
Property Address:
Contractor or Homeowner(if self) : G G�
Permit#: MS-20
Installation Date:
I
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
Q ICE PROTECTION INSTALLED:An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R906.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND:The.structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
I� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USE RUSTED METAL OR PLASHING: Existing vent flashing, metal edges,
drain outlets, gollars or metal counter-flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's Installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6) j
Signature of Prim In ler Date
A/ -5
Signature of P older Date
I