EL-2014-03365_0001 (3).tif BUILDING INSPECTION REPORT
Y OF BLAIR ❑ WASHINGTON COUNTY DOTHER
LOCATION OF INSPECTION:
NAME OF OWNER: = w PHONE#:
k Al, -is
PERSON REQUESTING INSPECTION: PHONE#:
SET TIME
DATE INSPECTION REQUESTED:
A lk TIME INSPECTION REQUESTED: [,ANYTIME
PROJECT DESCRIPTION:
A--,U,J
TYPE OF INSPECTION: ❑ 1ST INSPECTION Y. RE-INSPECTION El CONFERENCE El STATUS CHECK
BUILDING: DFOOTING DDECKFOOTING DFRAMING DDRYWALL EIPARTIAL EIFINAL PASSED FAILED
PERMIT NO.: CONTRACTOR: RECORDED: El El
UTILITIES: El SEWER TAP El SEWER E1SEPTIC DWATER TAP EIWATER SERVICE DPARTIAL E]FINAL PASSED FAILED
PERMIT NO.: CONTRACTOR: RECORDED:
DPEP -
ELECTRICAL: ❑ROUGH IN MANENT SERVICE El TEMPORARY SERVICE DPRE-CONNECT DPARTIAL FINAL PASSED FAILED
A'V
J 4, ❑
PERMIT NO.: CONTRACTOR: c RECORDED:
MECHANICAL: EI ROUGH-IN El A/C El FURNACE 0 HEAT PUMP EIFIREPLACE El GEOTHERMAL DRADIANT HEAT PASSED FAILED
DPARTIAL EIFINAL El 1:1
PERMIT NO.: CONTRACTOR: RECORDED:
PLUMBING: EIGROUNDWORK EIROUGHIN OPRESSURETEST DPARTIAL FIFINAL PASSED FAILED
PERMIT NO.: CONTRACTOR: RECORDED:
ElOCCUPANCY GRANTED D CONDITIONAL OCCUPANCY GRANTED El 911 SIGN DRE TURN DEPOSIT [:]FORFEIT DEPOSIT
NOTES/REMARKS:
fI
CC
4
'W SHINGTONCO.INSP v
INSPECTOR OR OTHER
DATE OF INSPECTION: Ell] TIME:
EMAILED TO OPPD OR BCPPD 11 DATE: INITIALS: