EL-2014-03365.tif BUILDING INSPECTION REPORT
TY OF BLAIR El WASHINGTON COUNTY DOTHER
LtONOF INSPECTION: V
rz
NAME OF OWNER: PHONE#:
PERSON REQUESTING INSPECTION: PHONE#: ---t
SET TIME
DATE INSPECTION REQUESTED: TIME INSPECTION REQUESTED:
F-lANYTIME
e
PROJECT DESCRIPTION-
41, cl CR
as
TYPE OF INSPECTION: 1ST INSPECTION El RE-INSPECTION El CONFERENCE El STATUS CHECK
BUILDING: EIFOOTING DDECK FOOTING DFRAMING DDRYWALL 0PARTIAL EIFINAL PASSED FAILED
"","S 6�o i6", RECORDED:
PERMIT NO.: CONTRACTOR:
UTILITIES: El SEWER TAP EISEWER EISEPTIC DWATER TAP DWATER SERVICE EIPARTIA-L ElFINAL PASSED FAILED
PERMIT NO.: CONTRACTOR: RECORDED:— 1:1 El
ELECTRICAL: El ROUGH IN El PERMANENT SERVICE E]TEMPORARY SERVICE EIPRE-CONNECT EIPARTIAL 41�'FINAL,: PASSED FAILED
PERMIT NO.: RECORDED:
CONTRACTOR:—,, FJ
MECHANICAL: E]ROUGH-lN El A/C DFURNACE E]HEAT PUMP DFIREPLACE D GEOTHERMAL EIRADIANT HEAT PASSED FAILID.
DPARTIAL EIFINAL El El
PERMIT NO.: CONTRACTOR: RECORDED:
PLUMBING: RGROuNDwoRK EIROUGH IN E]PRESSURE TEST E❑-1PARTIAL El FINAL PASSED FAILED
d
PERMIT NO.: CONTRACTOR: RECORDED: El 1:1
ElOCCUPANCY 6RANTED El CONDITIONAL OCCUPANCY GRANTED E1911,SjGN EIRE URN DEPOSIT DFORFEIT DEPOSIT
4-
NOTES/REMAEk
4V
S" 6A,fFe�
J
j
WASHINGTON CO.INSPECTOR,CITY INSPECTOR OR OTHER:
DATE OF INSPECTION: o Li TIME.
EMAILED TO OPPD OR BCPPD 0 DATE: INITIALS: