Loading...
EL-2014-03365.tif BUILDING INSPECTION REPORT TY OF BLAIR El WASHINGTON COUNTY DOTHER LtONOF INSPECTION: V rz NAME OF OWNER: PHONE#: PERSON REQUESTING INSPECTION: PHONE#: ---t SET TIME DATE INSPECTION REQUESTED: TIME INSPECTION REQUESTED: F-lANYTIME e PROJECT DESCRIPTION- 41, cl CR as TYPE OF INSPECTION: 1ST INSPECTION El RE-INSPECTION El CONFERENCE El STATUS CHECK BUILDING: EIFOOTING DDECK FOOTING DFRAMING DDRYWALL 0PARTIAL EIFINAL PASSED FAILED "","S 6�o i6", RECORDED: PERMIT NO.: CONTRACTOR: UTILITIES: El SEWER TAP EISEWER EISEPTIC DWATER TAP DWATER SERVICE EIPARTIA-L ElFINAL PASSED FAILED PERMIT NO.: CONTRACTOR: RECORDED:— 1:1 El ELECTRICAL: El ROUGH IN El PERMANENT SERVICE E]TEMPORARY SERVICE EIPRE-CONNECT EIPARTIAL 41�'FINAL,: PASSED FAILED PERMIT NO.: RECORDED: CONTRACTOR:—,, FJ MECHANICAL: E]ROUGH-lN El A/C DFURNACE E]HEAT PUMP DFIREPLACE D GEOTHERMAL EIRADIANT HEAT PASSED FAILID. DPARTIAL EIFINAL El El PERMIT NO.: CONTRACTOR: RECORDED: PLUMBING: RGROuNDwoRK EIROUGH IN E]PRESSURE TEST E❑-1PARTIAL El FINAL PASSED FAILED d PERMIT NO.: CONTRACTOR: RECORDED: El 1:1 ElOCCUPANCY 6RANTED El CONDITIONAL OCCUPANCY GRANTED E1911,SjGN EIRE URN DEPOSIT DFORFEIT DEPOSIT 4- NOTES/REMAEk 4V S" 6A,fFe� J j WASHINGTON CO.INSPECTOR,CITY INSPECTOR OR OTHER: DATE OF INSPECTION: o Li TIME. EMAILED TO OPPD OR BCPPD 0 DATE: INITIALS: