Loading...
Checkoff Sheet MS-2014-02681.tif Oct 01 15 07:44a Allison Blaich 402- 933 -2995 p.4 09 UNITE' NATIO'NAURESIDENTIAL CODE CITY OF BLAIR REROOFING GHECKOFF' SHEET etdrn to Blair City ball prig to Final Inspection 21$ S 16 1h Street, Blair, NE 65006 Because of limitations caused by the infeasibility to perform detailed inspectipns which would next interfere with reroofing work, please indicate compliance with the following requirements following this- reroofing ,fob. ,,11 Property Address: '"7 �i , A 1 F .1 Contractor or Homeowner (if self} : lc � L Permit: MS -2014- dA �W Installation Date: - YES NO The materials and methods of application used for recovering or replacing the existing I roof covering comply with the requirements of the building code, (R907.1) ICE PR©TECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymerr modified bitumen sheet was installed and extends at least from the e'ave's edne to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) STRUCTi URAL COMPONENTS ARE S.0UND: The structural'roof components are ! capable of supporting the roof covering, system and the material and equipment loads thatwill be encountered during installation of the roof covering'system. (8907.2) EXISTING C(a1fIrRING'itl1AS REMOVED; Existing roof covering was removed for one I of the reasons required by section 8907.3 ll ©l© -NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain cutlets, collars or metal counter flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Slgna re of Pff ary installer bate Signature of Permit Holder Date