Loading...
Checkoff Sheet MS-2015-00146.tif i i I 2009 INTERNATIONAL RESIDENTIAL CODE' CITY OF BLAIR REROOFING CHECKOFF SHEET Retum to Blair City Hall prior Final inspection 218 S I le Street, Blair, NE 68008 Because of limitations caused by the Infeasibility perform detailed Inspections which would n _ot interfere with reroofing worts, please Indicate compliance with the following requirements folIowln. this reroofing job. Prope ddr sa I Contractor or Homeowner (If self) M Permit #: Installation Date; fit° YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. 8907.1 r f g I py q ( ) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covWng system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVE13s Existing roof covering was removed for one of the reasons required by section 8907,3 mID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted, (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturers installation instructions. Metal flashing to which bituminous materiats are to be adhered shall be primed prior to Installation. (R907.6) Signature of Primary Installer date III aLss Signatu of Permit older ate I