Loading...
Checkoff Sheet MS-2014-01923.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING Return to Blair City Hall prior to Final Inspection 218 S 16 th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. ° Property Address: A 5 Contractor or Homeowner (if self) Permit #: IVIS -20_jq_- 0 !. 2 - 3 Installation Date: OC YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) 1AI ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) i ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) �,J ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance manufacturer's installation instructions. Metal flashing with approved manufact g to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) i S natur nmary Insta er -- - Date Signature of Permit Holder Date I i