Loading...
Checkoff Sheet MS-2014-01770.tif i i I 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET R eturn to B lair City Hall prior to Final Inspection 2 18 S le Street, lair, NE 68,0 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing worse, please indicate compliance with the following requirements � this reroofing job. Property Address: 948 28th St I ontractor or Homeowner (if self) Valley Boys j I Permit : b 14 m 01770 f Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE RO`I'F CTiN llTs4LLE: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was and extends at least from the eave's edge to a point at least 24 inches inside the exterior wail line of the building. (8905.2.7.1) STRUCTURAL QOMPONENTS ARE SGIIND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WA R NIGVE® Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE USTEq FETAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5) PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) , i gnature PH ry Installer ate a l Sign ure of ermit Holder Date I I I