Loading...
Checkoff Sheet MS-2014-01627.tif i i I I 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City all prior to Final Inspection 1 l 1 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements f2g2t lncr this reroofing Job, Property Address: 2046 Colfax St Contractor or Homeowner (if self) : Valley Boys Permit#: 14 -0162 Installation Date; -- I J %i 14 YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) I ICE PFtBTECTION IPI `PALLED. An ice barrier that consists of at least two layers of underiayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the ea e's edge to a point at least 24 inches inside the exterior wall dine of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING DOVERINO w&S REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ID NOT USE RUS'PECr FETAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) SLASHING INSTALLED PROPERLY; Flashing shall be reconstructed in accordance with approved manufacturer's installation Instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) S" star a Pr' ary Installer °" — — D to Signature a ermit Voider p ate i I i