Checkoff Sheet MS-2014-01495.tif 2009 INTERNATIONAL RESIDENTIAL. CODE'
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return 1 it th 1 i Final Inspection
218 S street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
_not Interfere with reroofing work, please indicate compliance with the following requirements
followlffl this reroofing Job.
ProperW Address: '
Contractor or Homeowner (if self) :
Permit#: CV[ M0y.e
Installation Date: "f
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (89052.7.1)
STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering systerrt and the material and equipment Toads
that will be encountered during installation of fibs roof covering system. (8907,2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed fpr one
of the reasons required by section 11907.3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
With approved manufacturer's Installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installation.. (8907.6)
Signature, f Primary Installer Date
" Z Z
igfore of Permit Holder Date
i
- i