Loading...
Checkoff Sheet MS-2014-01489 (2).tif Oct 01 15 07;43a Allison Blaich 402- 933 -2995 p.2 A"" U INTE"'NATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF' SHEET i ettiirn to Blair City Hall prior to Final Inspection 21 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspectlons which would not interfere with reroofing work, please indicate compliance with the following requirements following this - reroofing job. Property Address: Z{�hrv5; & J C Contractor or Homeowner (if se'1f) : .� I� �� � L �, Permit #: M,9 - 2014. Installation Dater m ~ /- 1 �-- c c ] C ! YES . NO to �I The materials and methods of application used for covering or replacing the existing. roof covering comply with the requirements'of the building code. (R907.1) EGE f'ROTECT[ON INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and t� extends at least from the eavds edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE •S.OUND: The structural'roof e o components are r capetbla of supporting the roof covering, system and the material and equipment loads that will he ericoun;tered during installation of the roof covering system. (1'907.2) �. EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one -� of the reasons required by section 8907.3 D ID-NOT USE RUSTED METAL OR FLASHING: Exlsting vent flashing, metal edges, drain outlets, collars or metal counter- flashing were•not reinstalled if rusted. (R907.5) ';�Z FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance iWtth approved manufacturer's installation instructions. Metal flashing to which bituminous ma erials are to be adhered shall be primed prior to installation. (8907.0) Signature of rirnary En ller Da �- Signature of Permit Holder Date 4 fo i