Checkoff Sheet MS-2014-00856.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to rinal inspe ction
218 8 16' Street, 1 air, NE 68008
88cause of limitations caused by the Infeasibility to perform detailed Inspections which would
Uo interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit&, --z-o S 7
Installation Date-, 2
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
INSTA LLED, , An ice barrier that consists of at least two layers of
undarlayment or of a self-adhering polymer modified bltumen sheet was _installed and
extends at least from the a a
save's d to a Writ at least 24 inches _eUnside the exterior
wall line of the building. (11905.2.7.1)
STRUCTURAL COMPONENTS AIDE SQUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment load
that will be encountered during installation of the roof covering system. (11907.2)
EXISTING 9O._VERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR ELASHING: Existing vent fleshing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted, (11907.6)
FLASHING INSTALLED P ROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bitwni u C,8 are
a
ls s materials to be adhered shall be primed prior to installation. (11907.6)
rlmtalier Date
lder D Cie