Checkoff Sheet MS-2014-00789.tif INTERNAT 1
CITY OF BLAIR REROOFING CHECKOFF SH
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NB 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements j
following this reroofing job.
a,
�r I
Property Address:
Contractor or Homeowner (if self) : .` " Jlf, �
Permit #: iV1S -20
Installation Date:
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
• roof covering comply with• the requir ements of the building code. (R907.1)
that consists of at least two ❑ ICE PROTECTION INSTALLED An ice barrier layers of Y
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, gollars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
With approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation.. (R907.6)
i
Signature of Primary Installer Date
SyUl ure of-Permit Holder Date