Loading...
Checkoff Sheet MS-2014-00789.tif INTERNAT 1 CITY OF BLAIR REROOFING CHECKOFF SH Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NB 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements j following this reroofing job. a, �r I Property Address: Contractor or Homeowner (if self) : .` " Jlf, � Permit #: iV1S -20 Installation Date: YES NO ❑ The materials and methods of application used for recovering or replacing the existing • roof covering comply with• the requir ements of the building code. (R907.1) that consists of at least two ❑ ICE PROTECTION INSTALLED An ice barrier layers of Y underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, gollars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance With approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation.. (R907.6) i Signature of Primary Installer Date SyUl ure of-Permit Holder Date