Loading...
Checkoff Sheet MS-2014-00589.tif INTERNATI C ITY OF BLAIR REROOFI Return to Blair Cit Hall prior to Final Inspection 21 8 S 16 th Street, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements j following this reroofing ` job. Property Address: Contractor or Homeowner (if self) Permit 4: MS-20 � Installation Date: YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with• the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED An lea barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 ❑ DID NOT USE RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, gollars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed pr'orto installation.•(R907.6) �%WA Sig lure of Primary Installer e Sig at re of Per it Holder Date • a I i I