Checkoff Sheet MS-2014-00589.tif INTERNATI
C ITY OF BLAIR REROOFI
Return to Blair Cit Hall prior to Final Inspection
21 8 S 16 th Street, Blair, NE 68008
Because of limitations caused by the Infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements j
following this reroofing ` job.
Property Address:
Contractor or Homeowner (if self)
Permit 4: MS-20 �
Installation Date:
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with• the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED An lea barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
❑ DID NOT USE RUSTED METAL OR PLASHING: Existing vent flashing, metal edges,
drain outlets, gollars or metal counter - flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed pr'orto installation.•(R907.6)
�%WA
Sig lure of Primary Installer e
Sig at re of Per it Holder Date
• a
I
i
I