Loading...
Checkoff Sheet MS-2014-00445.tif 09/25/2015 10:40 FAX 4025332173 10001/001 2009" UNTER'NATIONAL RESIDENTIAL CODE CITY OF BLA REROOFI Return to B lair City Hall prior to Fi nal Inspection 210 i6th Street, Clair, NE 8$008 B of Iimitatlana caused by the infeasibility tli comeliance�w1t17 detailed tlielfollo woul VVing � quit rnen#� no Irl terPere wi reroofing work, plea >� followin thla reroofing job. Property Address: Contractor or Homeowner (Itself) Permit #t:: MS -20 _ / Installation pate: I YES N o The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code, (1907.1) lCl;PaOTECTION INSTALLED: An ice barrier nst l ed sd and underlayment or of a self adhering polymer Modified bitumen shoat was extends at least om the eaye's edgg to a point at least 24 inches Iri�e the exterior wall line of the building. (8905.21.11) 57 UCTU L COMPONENTS ARE SQUNQ -, The structural roof components are capabla of suporting the root covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (1 807 Cj EXISTING COVERING WAS REMOVED. Existing roof covering was for one of the reasons required by saotion 8007,3 tC NOT USE gUSTgg METAL OR FLAS ING: E)dsting vent flashing, metal edges, drain outlets, goliars or metal counter- flashing were not reinstalied if rusted, (11907.6) FLASHlN SIN TALLE0 P a ERLY� Flashing shall be reconstructed In accordance with approved manufaoturees installation Instructions, Metal flashing to which bituminous materials are to be adhered shall be primed prior to lnstallatlon.�(RS07.8) gna r of Prima installer Date ff. �4A L L L 81gnature of arm older Data