Checkoff Sheet MS-2014-00348.tif Sep. 24. 2015 11:51AM No, 3719 P. 2
2009 INTERNATIONAL RESIDENTIAL CODE'
CITY OF BLA REROOFING CHECKOFF SHEET
Return to Blair City Mall prior to Anal inspection -
M B 10 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed Inspections which would
no interfere with reroofing work, please Indica'to compliance witil the following requirements
fnllowincl this reroofing Job -
Pro pertj Address:
Contractor or Homeownar (if self)
t r )
Pe MS-20
Ins #allatlon t]a #e: —
YE NO
C1 The m and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code, (11907.1)
i
ICE PROTECTION INSTILLED An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at feast from the cave's ed a to a point at least 24 inches inside the exterior
wall line of the building. (11905,2.7.1)
s rRUCTU RAIL COMPONENTS ARE iOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (11907,2)
EXIS7CNC CC1dgRING WAS REMOVED. Existing roof covering was removed for one
of the reasons required by section R907.3
(� DID NOT USE RUSTW i P-TAL OR FLASHING: EAsting vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not relnsta lied if rusted. (8907.5)
FLASHING INSTAL1,ED PROPERLY: Flashing shall be reconstructed in accordance
With approved manufacturers installation instructions. Metal flashing to which
bituminous materials are to be adheared shall be primed prior to installation..(R907. 0 ,)
S' nature o Primary In r Date
.` q Is
� r
Date
natur of Permit Hold
Slg