Checkoff Sheet MS-2014-01894.tif i
4.
CUV
cr rio '� ®final lns�
Return to $� A tih! Hat � 5treet1 i1r1 1, 6soo$ ' ons which would
datatted t inspQCtt
erform uiremen
e of timltations caused by the infeaslbtttty to dance with the follaWlng i eg
'Becaus Work, please indicate Can►
n ot interfere with reroofing S
ollowin this reroofing job.
Properly Address: 2"16,9
4-c
C '
Permit #' MS -20�. ---
Installation Date.
s
Y Na lication used for rocovering or replacing the existing
Q The materials and methods of app
roof covering comply with the requirements of the building code. (8907.1) of
PROT ECTION INSTALLED: An Ice barrier that consists of at leas tw In stalled a d
Q
ICE PROT modified bitumen sheet w s
underlayment or of a self - adhering polymer
extends at ye's e dge to a Point
at least 24 inches inside
least from the ea the exterior
wall line of the building. (R905.2.7.1) I
STRUCTURAL. COMPONENTS ARE SOUND. The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED. Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USE RUSTED METAL OR FLASHING; Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
J M FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's Installation instructions. Metal flashing to which
b to ous m are to be adhered shall be primed prior to Installation. (R907.6)
S n tdr e Pri ns Ile Date
%6a Uri it older Date
i
I