Checkoff Sheet MS-2014-01896.tif i
I
ODE
2009 INTERNATIONAL RESIDENTIAL C
w SHEET
�., ` eCirlotl
CITY OF `
Blair city Hall prior to Final inssp
Return to th st Blaiir, NE 6800
�'� 8 S � 6 actions which would
the Infeasibility to perform detailed fola requirements
tease indicate compliance with the f a
Because of li ro reroofing caused rk p t` �»
not interfere with of ��
fottowin this reroofing fob. �°� � � n
Property Address:
Z ,-
Contractor
Permit M. MS'2U 5
I bate:
YES NO or replacing the existing
is and methods of application used for recovering
The materia the requirements of the building code. (R907.1)
n comply with
roof covering lay of nsists Of at least two
TECTION 1NSTAt -1-151): An ice barrier that bitumen sheet was_ _ ►ns� d and
PRO of mar modified
underlayment or of aself- adhering p Y Dint at least 24 inches inside the exterior
extends at least from the eave's ed�c e, to a p
wail line of the building. (R905.2.7.1)
ORAL COMPONENTS ARE SOUND. The structural roof components are
STRUCT stem and the material and equipment loads
capable of suppodi 19 the roof covering s Y
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
[� DiD NOT USE RUSTED METAL OR FLASHING: Existing vent flashi f if m etal edge
drain outlets, collars or metal counter-f were not reinStalled
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's Installation instructions. Metal flashing to which
bitum ous materials are to be adhered shall be primed prior to installation. (8907.6)
Si na / t / ur ri Installe r Date
Date
Signat re f ermit Holder
I
i