Loading...
Checkoff Sheet MS-2014-01896.tif i I ODE 2009 INTERNATIONAL RESIDENTIAL C w SHEET �., ` eCirlotl CITY OF ` Blair city Hall prior to Final inssp Return to th st Blaiir, NE 6800 �'� 8 S � 6 actions which would the Infeasibility to perform detailed fola requirements tease indicate compliance with the f a Because of li ro reroofing caused rk p t` �» not interfere with of �� fottowin this reroofing fob. �°� � � n Property Address: Z ,- Contractor Permit M. MS'2U 5 I bate: YES NO or replacing the existing is and methods of application used for recovering The materia the requirements of the building code. (R907.1) n comply with roof covering lay of nsists Of at least two TECTION 1NSTAt -1-151): An ice barrier that bitumen sheet was_ _ ►ns� d and PRO of mar modified underlayment or of aself- adhering p Y Dint at least 24 inches inside the exterior extends at least from the eave's ed�c e, to a p wail line of the building. (R905.2.7.1) ORAL COMPONENTS ARE SOUND. The structural roof components are STRUCT stem and the material and equipment loads capable of suppodi 19 the roof covering s Y that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 [� DiD NOT USE RUSTED METAL OR FLASHING: Existing vent flashi f if m etal edge drain outlets, collars or metal counter-f were not reinStalled FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's Installation instructions. Metal flashing to which bitum ous materials are to be adhered shall be primed prior to installation. (8907.6) Si na / t / ur ri Installe r Date Date Signat re f ermit Holder I i