Loading...
734_0001 (3).tif i I I i I I HEREBY ATTESTTHATTHE FOLLOWING TEST REQUIRE- MENT ON THE 2 PSIG GAS PIPING SYSTEM AT: STREET CITY STATE i HAS BEEN MET OR EXCEEDED: "PRIOR TO THE INSTALLATION OF ANY FUEL LINE OR APPLIANCE REGULATORS, CAP AND SEAL THE PIPING SYSTEM(S), AND TEST WITH AIR AT A PRESSURE OF 10 PSIG FOR AT LEAST 30 MINUTES. AFTER COMPLETION ON THE AIR TEST, INSTALL THE NECESSARY REGULATORS AND SOAP TEST ALL CONNECTIONS FOR LEAKAGE.' CONTRACTOR INSTALLER DATE ' _ ` Black 1110115 74 or qy I FORM 48 -0151 (IO /0£3)