Checkoff Sheet MS-2014-01040.tif i
I
Sep, 25. 2015 11:52AM No. 3739 P. 9
2009 INTERNATIONAL RESIDENTIAL CODE
1
Return to lair City Hail prior to Final Inspection
218816 th Street, Blalr, NE 68008
Beoause of limitations caused bytho Infeasibility to perform detailed inspoctions which would
no lrtterl -ere with reroofing work, please indicate compliance mdth the fallowing requiremenjta
Ntlo this reroofing job.
Property Address:
:A C ontractor or EComeowrlao* (If self) ; _ n d!t0ffi
Permit
Installation pate-. --
YE NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply witil the requlrerr MS of the building cede. (11.007,11)
1C1 t�I OTEGTIsON.INSTI�� 1 ~ED: An Ice barrier that consists o f at least two layers of
underlayment or of a self adhering polymer modified bitumen sheet was installed. and
extends at lea s$ from the eave� to a point at least inches Inst'de the Prtorlor
wall line of the building. (R905.21,11)
sTRUCTUI AL DOMPONEWS Altg ADUND: The-structural roof components are
eapabla of supportlhg the roof c❑vbring system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R007,2)
M187iNG COV5RING WAS REM OVED: Misting roof covering was removed for one j
of the reasons required by section 8907.8
F)ID hIDT 13,91✓ RuST51) I F-TAL QR FLASHING dating vent flashing, metal edges,
drain outlets, Boilers or metal counter- t1ashlrng were not Wnstalled if rusted. (8907.5)
'
FLASHING iNSTAI. LE13 PRQI�E LY: Flashing shall be reconstructed In accordance
with approved manufacturer's Installation instructions, Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installatlon. (R007.G)
natu a of Pa ller pate
rlm
slgnatura of Permit Holde Gaffe