Loading...
`Checkoff Sheet MS-2014-01197.tif Sep. 25.2Q15 11,51AM No. 3739 P. b 2009 INTERNATIONAL RESIDENTIAL CODE' - CITY OF UA REROOFING CHECKOFF SHEET Return to Blair C Hall prior to Final Inspection 218 S 16" Street, B lair, NB 65008 l3ecauso of limitations caused bythe infeasibility to perform detailed inspections whichwould not interfere with raroofing work, please indicate compliance with the following requirements fgjpWjffl this reroofing job. Fropartj Address Contractor or Homeowner (if self} ; _�i 1 Permlt #-: 1 • � t� � ± I nstallation Dafea YE NO The materials and methods of application used for recovering or replacing the oxIsting roof covering comply vritli the requirements of the building code. (R007J) . l I CE PROTEC`T'ION INSTALLED An iGe barrier that consists of at least two layers of underlayment or of a self adhering polymer modified bitumen sheet was Installed and extends at least from the eaye's to a point at least 24 inches lnslde the exterior wall lltie of the building. (R90521J) STiRUG fURAR COW ONENTSAPMa ~lNl3:. `fhestruofural roof components are capable of supportlihq the roof covorinU systerri and the material and equipment loads flat will be encountered during installation of the roof covering system. (8.907,2) I EXISTING COVERING WAS REMOVED. roof covering was remove=d for one of the reasons required by seotlon R 07.3 L RID NO T U85 RUaS D IV ETAI- O.R FLASHING; Bdating vent flashing, matal edges, drain outlets, collars or metal cour fer- t]ashing were not refistallgd if rusted. (8907.5) } FLASHING INSTA LLED PROPf RI Y' Flashing shall be reconstrUdefd In aocordancs with approved manul installation instructlons. Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installation.- (8907.9 natu a of Prima Iler Date Signature of Psrmlt Holde Date I