`Checkoff Sheet MS-2014-01197.tif Sep. 25.2Q15 11,51AM No. 3739 P. b
2009 INTERNATIONAL RESIDENTIAL CODE' -
CITY OF UA REROOFING CHECKOFF SHEET
Return to Blair C Hall prior to Final Inspection
218 S 16" Street, B lair, NB 65008
l3ecauso of limitations caused bythe infeasibility to perform detailed inspections whichwould
not interfere with raroofing work, please indicate compliance with the following requirements
fgjpWjffl this reroofing job.
Fropartj Address
Contractor or Homeowner (if self} ; _�i 1
Permlt #-: 1 • � t� � ±
I nstallation Dafea
YE NO
The materials and methods of application used for recovering or replacing the oxIsting
roof covering comply vritli the requirements of the building code. (R007J) .
l I CE PROTEC`T'ION INSTALLED An iGe barrier that consists of at least two layers of
underlayment or of a self adhering polymer modified bitumen sheet was Installed and
extends at least from the eaye's to a point at least 24 inches lnslde the exterior
wall lltie of the building. (R90521J)
STiRUG fURAR COW ONENTSAPMa ~lNl3:. `fhestruofural roof components are
capable of supportlihq the roof covorinU systerri and the material and equipment loads
flat will be encountered during installation of the roof covering system. (8.907,2)
I
EXISTING COVERING WAS REMOVED. roof covering was remove=d for one
of the reasons required by seotlon R 07.3
L RID NO T U85 RUaS D IV ETAI- O.R FLASHING; Bdating vent flashing, matal edges,
drain outlets, collars or metal cour fer- t]ashing were not refistallgd if rusted. (8907.5)
} FLASHING INSTA LLED PROPf RI Y' Flashing shall be reconstrUdefd In aocordancs
with approved manul installation instructlons. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installation.- (8907.9
natu a of Prima Iler Date
Signature of Psrmlt Holde Date
I