Loading...
`Checkoff Sheet MS-2014-00466.tif I Sep, 25. 2015 11:53AM No. 3739 P. 11 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City. Hall prior to Final Inspection v 218 8 10 street, B lair, NE 66000 Becausa of limitations caused by the infeasibliltyto perform detalled inspeeflons which would not Interfere with raroofing work, please indicate compliance with thO following requirements � following this reroofing jab. + Property Address: � 4 3 - Z - - - contractor or Homeowner (iftelf) p _+I+r�lc�� Permit 9. Installation Data. 1 -� -- Y NO � • � The materials and methods of application used for recovering or replacing the existing roof oovoring comply with. the requirements of the building code. (ROO7.1) [GR PROTECTION INSTALLED: An ice barrier that consists of at Ieast two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eav&s to a point at least 24 inches inside the .exterior wall Ilr a cffhe building. (8905,2.7.1) 87RUOTURAL COMPONENTS AR5 S'0gW.. The structural roof components are capable of supporting the roof covbrlrig system and the material and equipment loads thaf Will bo ancnuntered during installation of the roof covering system. (8907.2) RXISTjNr. COVERING WAS REMOVED Existing roof covering was removed for one of tha reasons required by section 1907.3 Fill] NOT Trish RUSTED, M T_�_AL Ci1 FLASHING- Existing Trent flashing, metal edges, ciraln Outlets, gollars or metal counter- flashing were not reinsfallad If rusted, (R9O7.6) FLASHING INSTALLED PROPERL">i'; C'lashing shall be reconstructed in accordance with approved manufacturer's installatlon lnstructlons. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installatlon.• (R9O7.6) natu a of Prima list Bate Cafe Signature of Permit Hold