Loading...
`Checkoff Sheet MS-2014-00293.tif i I Sep, 25, 2015 11; 54AM No. 3739 P. 14 2009 INTERNATIONAL RESIDENTIAL CODE' CITY OF 8LAIR REROOFING Return to Blair City Hall prior to Final i nspection 218 S I 6 street, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate complianeo with the following requirements fr- llowinn this reroofing job. Prapor g Address: confracfor or Homeowasr (if self) F�- f� Permit#t: Installation pa(e: )O zo YE NO Tha materials and methods of application used for recovering or re placing the existing roof covering comply with the requirements of the building cede. (1 j ICE PROTI -GTION INSTALLED An lce barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was fnstalled and extends at least from t h e e a_ve'e to a point at least 24 Inches insrde the exterior wall lirie of the building. 8 FRUCTURAL COMPONENTS ARE SOUNQ: Tha structural roof components are capable of supporting the roof covering system and the material and equipment loads that will ba encountered during Installation of the roof covering system. (11907.2) i 0 EXiSTCNG COVERING WAS P0= MCNED: Existing roof covering was removed for one 6 section 89 of the reasons r eq uired y . 07.3 pip moT use RUSTI�D METAL~ OP, FLASHIMP; Existing vent flashing, metal edges, Train outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHI INSTALLED PROPER [,Y Flashing shall be reconstructed In accordance With approved manufacturer's installation Instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation.. (R807.G) _. '2- DI S n a of Prima Iler pate Ignature of Permit Hold pate i