Loading...
Checkoff Sheet MS-2014-00396.tif i i Sep, 25, 2015 11:54AM No. 3739 P. 13 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF 13LAIR REROOFING Return to Blair City Hall prior to Final inapaot[on 218 S lo Street, Blair, NE 68008 eacause of lim1fations caused by the infeasibility to perform datalled inspections which would i not interfere with reroofing work, please indicate compliance with the following raquiremsnts following this raroofincd job. , • Propert� Address 2 ST Contractor or Homeowner (if self) Permit ; MS -20 �!~� Inatallation bate: { . Yh No The materials and methods of application used 'for recovering or replacing the existing j roof covaring comp►ym(R4 the requirements of the building code. (11907.1) ICE PROTECTION INSTALLED, An ice barrier that consists of at least two layers of underlaymont or of a self adhering polymer modified bitumen shoot was instalie and extends at least from the eaye's to a point at least 241 ches Insrde the exterior vvail line of the building. (11905.2.7.1) STRUCTURAL COMPONENTS ARE SQUN — b; The structural roof components are capable of supporting the roof coverinU system and the material and equipment loads thafwiil be encountered during installation of the roof covering system. (11907.2) d EXISTim. COVERING WAS REMgygD Fxisting roof covering was removed for one of the reasons required by section 1907.3 DID NOT UIM RUSTW ME — R FLASHING Existing vent flashing, metal edges, drain outlats, pollars or metal counter - flashing wars not reinstalled If rusted, (R907.5) PLASHING INSTALLED PRQPERM_Y: Flashing shall be reconstruoted in accordance with approved manufacturer's installation instructions, Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation.• (8007,6) . .i natu a of Prima ilex date Cate Signature of Permit Hold