Checkoff Sheet MS-2014-00577.tif i
Sep, 25. 2015 11; 52AM No. 3739 P. 10
2009 INTERNATIONAL RESIDENTIAL CODE
BLAIR REROOFING
Returns to Blair City Hall prior to Final inspection
210 16' tre t Slair, NE 08008
13ecausa of limitations caused by the Infeasibility to perform detailed Inspections whlch would
_ not Interfere with reroofing work, pleas% Indicate complianea with the following requirement
f this reroofing job.
vroperty ddrese: --
Contractor or (-{DMG0wn6V (If self) a 2AY11 kd ~� -- -
Permit 9:�0 1
Y Na
-'The materials and methods of application used for recovering or replacing the existing
roof covering comply with, tha requirements of the building oode, (11907.1)
(� 101 PROTP-GTIUN IN-STALLED An Ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was Installed and
extends at laastfrum the aa to a point at least 24• inches insrde the exterior
wall liiia of the building. (R@05.2.7,1)
STRUCTURAL COMPONENTS ARE gOUND.- Tha structural roof components are
capabia of supporting tha roof cnvbring systern and the material and equipment loads
that will be encountered during Installation of the roof covering system. (8807.2)
EXIS`i'iNG COVERING WAS REMOVED: 5xisting roof covering was removed for one
of the reasons required by section 8907.3
DID NOT use RUSTvr) ME Qg >i LASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not re[nsfalld l trr, sted, (R907,5)
FLASHING INSTALLED PRQPF-R Y Flashing shall ba reconstructed in accordance �
with approved manufacturers installatlon Insfructions. Metal flashing to which �
bituminous materials are to be adhered shall be primed prior to installation.-(R@07.8)
oat a ofPrlma Her pate
Date
Signature of permit Hold
i