Checkoff Sheet MS-2014-01128.tif Sep, 25. 2015 11; 51AM No. 3739 P. 8
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF 8LAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final inspection
21 a 16ti' street, Blair, NE 66006
j3ocausL& of limitations caused by the infeasibility to perform detailed inspectlons which would
of Inter -ere with reroofing work, please indlea #e complianoa with tho foll+owIng requiromen
_ fullowIng . this reroofing jOb
Property Address: T _' V
Contractor or Homeowner (If self) o Mid lid i` _o y A
lins4aliaflorr pate„ ._ 1�1 �� �'� i � •
YE NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with- the requirements of the bulfdlrig code. (11907.1)
IC PRC1T Di'I01N IIqSTA LLED An ice barrier that consists of at least two layers of
underlayment or of a self✓adherinj polymer modified bitumen sheet was installed and
extends at least from th eave'a a to a point at least 24 inches insl'de the pxgerior
wall line of the building. (R005.2.7.1)
5`I"I UC UI?AL comPDNENTs Ate 9OUND: Tha structural roof components are
capable of supporting the roof covbring system and the matadal and equipment loads
that will be encountered during installation of the roof covering system. (8807.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
i� alb NOT USE RUSTVD M TAL, OR,) ASHiNG., = dafiing vent flashing, metal edges,
drain outlets, golfars or metal counter flashing were not reinstalled If rusted, (11907.0
- Ao711 p INOTALL.GD 01101 Flashing ohall bo r000noEruotad in a000rdanoo
with approved manufacturer's instaliation instructions. Metal flashing to which
bituminous materials are to be adhared shall be pilmed prior to Installation.. (R @07.q)
natu a of Prima liar pate
I
Dat Sign ature of Permit Hold
f
i