Loading...
Checkoff Sheet MS-2014-01196.tif i � Sep, 25. 2015 11.51AM No. 3739 P. 7 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City, fell prior to Final Inspection 2.18 816 Street, Blair, NE 68008 Because of lim1fations caused by the infeasibility to porform detailed inspections which would not interfere with reroofing work, please Indicate compliance with the folloveing requirements foliowing. this reroofing jots. Property Address Confractor or Homeowner (if self) R _�� mid Y Permit f; a�0� �. Installation paten YES NO I The matermla and methods of application u sed for recovering or replaoing the w4fin roof oovering Comply with the requirements of the building cede. (11907.1) ICE PROTECTION INSTALLED; M ice barrier that consists of at least two layers of underlayment or of a self - adhering polyrner modified bitumen sheet was installed and extends at leastfrom the eaye's a point at least M Inches Insrds the exterior wall line ffhs building. (R905.2.7.i) STRUOTURAL SI7IVIPO ENTS ARr, SbUNM. The structural roof components are capable of supportll'tg the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907,2) EXISTING COVERING WAS REMOVE)'] - Existing roof covering was removed for one of the reasons required by seotion R 07.3 UID NOT USE RUSTM) METAL QR FLASHINO.R 048ting vent flashing, metal edges, drain ouiiefs, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY:. Flashing shell be reconstructed In accordance With approved manufacturer's Installation instructlons. Metal flashing to which bituminous materials are to be adheted shall be primed prior to Installation.. (11907.6) natu e of Prima Her Date — 2 , z1U Ugrrafiure of Permit: Hold4 Date i I i �I