Checkoff Sheet MS-2014-01196.tif i �
Sep, 25. 2015 11.51AM No. 3739 P. 7
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City, fell prior to Final Inspection
2.18 816 Street, Blair, NE 68008
Because of lim1fations caused by the infeasibility to porform detailed inspections which would
not interfere with reroofing work, please Indicate compliance with the folloveing requirements
foliowing. this reroofing jots.
Property Address
Confractor or Homeowner (if self) R _�� mid Y
Permit f; a�0�
�.
Installation paten
YES NO
I The matermla and methods of application u sed for recovering or replaoing the w4fin
roof oovering Comply with the requirements of the building cede. (11907.1)
ICE PROTECTION INSTALLED; M ice barrier that consists of at least two layers of
underlayment or of a self - adhering polyrner modified bitumen sheet was installed and
extends at leastfrom the eaye's a point at least M Inches Insrds the exterior
wall line ffhs building. (R905.2.7.i)
STRUOTURAL SI7IVIPO ENTS ARr, SbUNM. The structural roof components are
capable of supportll'tg the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907,2)
EXISTING COVERING WAS REMOVE)'] - Existing roof covering was removed for one
of the reasons required by seotion R 07.3
UID NOT USE RUSTM) METAL QR FLASHINO.R 048ting vent flashing, metal edges,
drain ouiiefs, collars or metal counter- flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY:. Flashing shell be reconstructed In accordance
With approved manufacturer's Installation instructlons. Metal flashing to which
bituminous materials are to be adheted shall be primed prior to Installation.. (11907.6)
natu e of Prima Her Date
— 2 , z1U
Ugrrafiure of Permit: Hold4 Date
i
I
i
�I