Checkoff Sheet MS-2014-01199.tif I
i
Sep, 25. 2015 11; 50AM No. 3739 P, 5
r ft W%
2009 INTMNA.TI NAL RE IDE TIAL CEDE' ���
ITT OF 13LAIR REROOFING C HECKOFF SHEET
Return to Blair City lull prig to Final Inspection
2'I 1 street, l31alr, NE 6800B
8 sea use of Jim itations caused by the Infeasibility to perform detailed inspections which would j
not interfera With reroofing work, please Irndicate compliance with the fallowing requirements
f+ollowin this raroatin j
Property Address:
Confractor or Homeowner (if salt)
hermit #t:
Installation pate: q 11v 11 —
YPA NO
I
'The The rrmatedals and methods of application used for recovering or replacing the existing
roof.covering comply witli the requirements of the building code. (8007.1)
ICE PROTECTION INsTALI_Ea� An ice barrier that consists of at least two layers of
underlayment or of a self -adhering polymer modified bitumen sheet was installe d. and
eAerlds at least from the eaye's•edgq to a point at Isast 24 Inches inside the exterior
wall 11115 ofthe building. (R905.2.7.1)
i
Q .STRUCTURAL COMPONENTS SOUND: Tho-structural roof components are
capable of supporting the roof covfseing system and the material and equipment loads
that will be encountered during installation of the roof covering system. (11007.2)
EXISTING CQV�RINC WAS REM OVE13 E)lsting roof covering was removed for one
of the ressons required by section 1;1907.3 �
DID NOT U85 RLiSTE)3 METAL OR F ASHINGw E)dating vent flashing, metal edges,
drain outlets, gollars or metal courifer- flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY, Ffashing shall be reconstructed In accordancs
with approved manufacturer's installation instructions. Metal flashing to whloh
Bituminous materials are to be adhered shall be primed prior to Installatlon,( 07.9
S" natu a of Prima liar Date
Date
Signature of Permit Hold
i