Loading...
Checkoff Sheet MS-2014-01667.tif I Sep, 25. 2015 11; 49AM No, 3739 P. 2 REROOFING 2009 INTERNATIONAL RESIDENTIAL CODE Return to Nair City tell prior to Final Inspootion v 2.16 S 16 S Blair, NE 68006 0ecause of limitations caused by the infeasibility to perform detailed inspections which would p t interfere with reroofing word, please indicate compliance with tha following requirements t'oli owing this raroo`l0 jolt. Propertg Address;_ l o w t , Contractor or Homeowner (if sel : ffi- l iii - �erEnit ' 'J q - Installatlon ba e, !� I r 1 l` Dzm) 1(E NO ' The materials and methods of application used for recovering or replacing the oxisting roof covering Comply with the requirements of the building code. (R907.1) C1 IC15 PROTECTION INSTALl_Eb; An ice barrier that consists of at lust two layers of underlayment or of a self - adhering p ofymor modified bitumen sheet was installed . and extends at lust from the eaye's�edge to a point at least 241 nches insl`de the exterior wall line of the building. (R905.2.7.1) i ;0 fRUCTURAL COMPONENTS ARE COUNp; The structural roof components are capable of supportlhg the roof covoririg system and the material and equipment loads that will be encountered during installation of the roof covering system. (1907.2) EXI ,TjNG GQV1 RINQ WAS REMOVED; 1= xlsting roof covering was removed for one of the reasons required by section 1 907.0 DID NOT T USE RUSTgp METAL QR FLASHING Nsfflig vent flashing, MOW edges, drain outlets, gollars or metal counfer- flashfng were not reinstalled If rusted. (R907.5) FLASHIRG INSTALLED ERQPERLY.. Flashing shall be reconstructed In accordance - with app roved manufacturefs installation instructions. Metal flashing to which bituminoua materials are to be adhered shall be primed prior to Installation. (R907.6) I I `.bi natu a of Prima liar `Date i Date Signature of Permit Mold