Checkoff Sheet MS-2014-01524.tif i
i
Sep, 25. 2015 11, 50AM No. 3739 P. 4
REROOF 2009 INTERNATIONAL RESIDENTIAL CODE
Return to Blair n y Hall priori . Final inspection
2'i0 S 1s Street, Blair, HE 68008
Because of Itmhatians caused laythe Infeasibilityto perform detailed inspections which would
not Interfere with reroofing work, ploaae Indicate compliance w9th the :Following requirementa
fQIIo in this reroofing job.
Propert Address:
�CarAtracto�' oar Homeowner (if self) � - i
Permit MS- 201�� C 1
Insta.liat pate° � z — -
YE No
- 'The materials and method's of applicatlon used for recovering or replacing the a lsttng
roof covering comply with the requirements of the building Dade. (R007.1)
ICE PROTECTION INSTALLED An lca barrier that consists of at least two Layers of
underlayment or of a self adhering polymer modified bitumen sheet was Installed and
extends a t l east from the eave's to a point at least 24 inches inside the exgedor
wall line ofthe building. (8006,2.7,1)
STRUCTURAL COMPONENTS ARE 50UND= The structural roof components are
I
capablEa of supporting the roof oavbring system and the matadal and equipment loads
thif will be encountered during inatallatlan of the roof covering system. (8907.2)
F-XISTiNG COVERING WAS RUOVED Existing roof covering was removed for one
of the reasons rewired by section R9
F)ID NoT uarm RUW5D WIETAL QR P1!_ASHIISD: Existing vent: flashing, metal edges,
drain outlets, Dollars or metal counter-flashing w ere not reinstalled If rusted. (8007,6)
P'I,ASHING INSTALL PROPERLY- Flashing shall be reconstructed in accordance
With approved manufacturer's installation Instructions Metal flashing to which
bituminous materials are to be adhared shall be primed prior to installation.• (1907.6)
natu a of Primal Her Pate
e7 n
Signature of permit Hold Pate
• i