Loading...
Checkoff Sheet MS-2014-01524.tif i i Sep, 25. 2015 11, 50AM No. 3739 P. 4 REROOF 2009 INTERNATIONAL RESIDENTIAL CODE Return to Blair n y Hall priori . Final inspection 2'i0 S 1s Street, Blair, HE 68008 Because of Itmhatians caused laythe Infeasibilityto perform detailed inspections which would not Interfere with reroofing work, ploaae Indicate compliance w9th the :Following requirementa fQIIo in this reroofing job. Propert Address: �CarAtracto�' oar Homeowner (if self) � - i Permit MS- 201�� C 1 Insta.liat pate° � z — - YE No - 'The materials and method's of applicatlon used for recovering or replacing the a lsttng roof covering comply with the requirements of the building Dade. (R007.1) ICE PROTECTION INSTALLED An lca barrier that consists of at least two Layers of underlayment or of a self adhering polymer modified bitumen sheet was Installed and extends a t l east from the eave's to a point at least 24 inches inside the exgedor wall line ofthe building. (8006,2.7,1) STRUCTURAL COMPONENTS ARE 50UND= The structural roof components are I capablEa of supporting the roof oavbring system and the matadal and equipment loads thif will be encountered during inatallatlan of the roof covering system. (8907.2) F-XISTiNG COVERING WAS RUOVED Existing roof covering was removed for one of the reasons rewired by section R9 F)ID NoT uarm RUW5D WIETAL QR P1!_ASHIISD: Existing vent: flashing, metal edges, drain outlets, Dollars or metal counter-flashing w ere not reinstalled If rusted. (8007,6) P'I,ASHING INSTALL PROPERLY- Flashing shall be reconstructed in accordance With approved manufacturer's installation Instructions Metal flashing to which bituminous materials are to be adhared shall be primed prior to installation.• (1907.6) natu a of Primal Her Pate e7 n Signature of permit Hold Pate • i