Checkoff Sheet MS-2014-01638.tif i
I
Sep, 25. 201 5 11; 49AM No. 3739 P. 3
2009 INTERNATIONAL RESIDENTIAL CODE'
CITY OF 13LAIR REROOFING CHECKOFF SHEE I
Return to Blair City, Wall prior to. Anal inspection
218 S 1 Street, Blain`, NE 68008 «
i
Because of III nitaflons caused by the infeasibility to perform detailed inspections which would
mt Interfere with reroofing work, please indicate compliance with the following requirements
rollowln this reroofing lob.
. �
'roperty Address: ,A
1
' I
Contractor or Homeowner (if asM : 4
p f ¢t7 m !!l 111 S �4����
.1 " yC. ' , 1 4 ��� •/ A y ,
Installation
e, --
YES NO
The materials and methods of application used for recovering or replacing the costing
roof covering Gomply witli the requirements of the building onde. (R007.1)
ICE PROTECTION INSTALLED An Ice barrier that consists of at least two layers of
underlayment or of a self adhering polymer modified bitumen sheet was installed and
extends at least from the cave's wine to a point at least 24 inrhea inside the exterior
wall lirie of the building. (P,906,2.7.1)
STiIUtXTIIRAt. CMPQNEITS A RF structural real' components ara
capable of supporting the roof covering system and the material and equtpmen4loads
that will be encountered during Installation of the M OT covering system. (R907.2)
EXISTING CC)V5RJN(3 WAS REMOVED. l xlsting roof covering was removed for one
of the reasons required by section 8907.3
))ILL N0T V$F RU &T1=R MP~TAL oR FLASHING Hxlstlnp venlr flashtng, metal edges,
drain outlets, rollers or metal counter- flashlrng were not reinstalled if rusted. (11907.5)
FLASHING INSTALLED PPOPERLY: Flashing shall he reconstructed In arcordanca
with approved manufarturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installatlon.- (R907.6)
S" natu a of F'rima Her Date
Date
Signature of Permit Holde
i