Loading...
Checkoff Sheet MS-2015-00566.tif 2009 INTERNATIONAL RESIDENTIAL CODE' CITY OF BLAIR REROOFING CHECKOFF Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following . this reroofing job. Property Address: ' ' Contractor or Homeowner (if self) Permit #: MS -20 Installation Date: YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with. the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, gollars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance With approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation.. (R907.6) . i s }_ r. Signature of Primary Installer Da e Signature of Permit Holder Date i