Loading...
Checkoff Sheet MS-2014-00460.tif i I 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR FIN Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements j following this reroofing job. Property Address: T & Contractor or Homeowner (if self) : � (n - e`'� Permit #: MS - 20 - Installation Date: YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) I ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with a ved manufacturer's installation instructions. Metal flashing to which i uminous atpr-iais are t e adhered shall be primed prior to installation. (R907.6) signat e f Prima4 in Date Signature of Per it Holder Date i