Loading...
Checkoff Sheet MS-2014-00704.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to lair C ity Ha p rior to in I Inspecti 218 S "' S treet, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed Inspections which would Mt interfere with reroofing work, please Indicate compliance with the following requirements followine this reroofing fob. Permit # : G LI p o ? �( i Installation Date. YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underiayment or of a self adhering polymer modified bitumen sheet was mgt W and extends at least from the eave's edge to a point at least 24 inches inside the exterior wail line of the building. (11905.2.7.1) STRUCTURAL COMPONENTS ARE SOIUN®: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS MOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 Or 0 NO RUS°C D FETAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (11907.5) FLASHING JNSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which biti us materials are to be adhered shall be primed prior to installation. (8907.6) Sigh rim s stalier bate Xzl Ider ®te I