Checkoff Sheet MS-2014-01063.tif From: Make Money Fax: (763) 780-6007 To: +14024264195 Fax: +14024264196 Page 3 of 3 09/03/2015 4:57 PM
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the Infeasibility to perform detailed Inspections which would
n_ot Interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address: J122 - (�Aldi�) J� 4�0' A'e
Contractor or Homeowner if self)i
Permit MS-20 61
,Installat o Date.
YPA NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at feast two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
STRUCTURAL COMPONENTS AIDE ROUND, Tha structural roof components are
capable of sup the roof covbdr)g system and the material and equipment loads
that Will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed In accordance
with approved manufacturers installation Instructions. Metal fl ashing to which
bituminous materials are to be adhered shall be primed prior to installation.- (8907,6)
c t
A /i
Signature 68rim lni6ller Date
Signature of Permit Holder Date