Loading...
Checkoff Sheet MS-2014-01284.tif I 2009 INTERNATIONAL 1ID _ • TIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, please Indicate compliance with the following requirements following this reroofing job. Q If 4 Permit fl: M 7 mi l/` v q _L-() If Installation Date: YEP' NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) (� ICE PROTECTION INSTALLED An Ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches Inside the exterior wail line of the building. (11905.2.7.1) Q STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (11907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled If rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) i SIgnj&K of Prkifery Installer Date Signal g of Permit Holder Date