Loading...
Checkoff Sheet MS-2014-03059.tif i 200-9 INTERNATIONAL RESIDENTIAL CODE I CITY OF BLAIR REROOFING Return to Blair City Hall prior to Final Inspection i 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements fo llowin g this reroofing job. Property Address: i Contractor or Homeowner (if self) q A- Permit #: IRIS- 2014 installation Date: , ,. YES NO The materials and methods of application used for recovering or replacing the existing I roof covering comply with the requirements of the building code. (R907.1) j ® ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underla ment or of a self-adhering polymer modified bitumen sheet was installed y gp y and extends at least "rom the eave's e ale to a I?oint at least 24 inches insid the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 I i ❑ `QI D N SE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, tlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be recon'structed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) I i < Signature of Primary Inialler Date i Signature of Permit Holder Date 1