Loading...
Checkoff Sheet MS-2014-03078.tif 2009 INTERNATIONAL RESIDENTIAL CODE' CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior t® Final Inspec tion 218 S 16 Street, lair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed Inspections which would ao_t Interfere with reroofing work, please indicate compliance with the following requirements foil owtn this reroofing Job. Pro ddress-. Contractor or Homeowner (if self) Permit #: MS-20 Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing .1) j roof covering comply With the requirements of the building code. (R907 ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall lirie of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that Will be encountered during installation of the roof covering system. (R907.2) EXISTiNG COVERING WAS REMOVED. Existing roof covering was removed for one olthe reasons required by section 8917.3 DID NOT USE RUST5D METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, Dollars or metal counter-flashing were not reinstalled If rusted. (R907.5) FLASHING INSTALLED PROPER Flashing shall be reconstructed in accordance with approved manufacturer's Installation Instructions. Metal flashing to which bituminous to be adhered shall be primed prior to Installation. (11907.6) ZZ/ Sign ffure of Primary Installer ate Sig f Permit �Hot*4r Date