Loading...
Checkoff Sheet MS-2014-00757.tif 2uU9 INTERNATIONAL RESIDENTIAL CUU CITY OF BLAIR REROOFING Return to Blair C Half prior to Final Inspection 218 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would i not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. ra Permit Installation Date: 6 YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE C PROTECTION INSTALLED: An ice barrier that consists of at least two layers of � underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 2 cinches inside the exterior wall line of the building. (R905.2.7.1) ® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installatiori of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 I I (� NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: f=lashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Sign ure of Primary Install Date F b� z Sig Lure of Permit Holder Date