Checkoff Sheet MS-2014-00757.tif 2uU9 INTERNATIONAL RESIDENTIAL CUU
CITY OF BLAIR REROOFING
Return to Blair C Half prior to Final Inspection
218 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which would
i
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
ra
Permit
Installation Date:
6
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE C PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
�
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at least 2 cinches inside the exterior
wall line of the building. (R905.2.7.1)
® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installatiori of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
I
I
(� NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: f=lashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Sign ure of Primary Install Date
F
b� z
Sig Lure of Permit Holder Date