2009 INTERNATIONAL RESIDENTIAL CODE
GITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
18 1 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
i
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address: L/I L j
I
Contractor or Homeowner (if self)
I
Permit #: MS -2014-
Installation Date: = /
i
YES NO
P
The materials and methods of application used for recovering or replacing the existing !
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable p of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
I
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
!
I
Signature of P " ary Inst Date
i
i
Signature of Permit Holder Date