Loading...
Checkoff Sheet MS-2014-02562.tif _ + 9 2009 INTERNATIONAL RESIDENTIAL CODE GITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 18 1 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would i not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address: L/I L j I Contractor or Homeowner (if self) I Permit #: MS -2014- Installation Date: = / i YES NO P The materials and methods of application used for recovering or replacing the existing ! roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable p of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) I FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) ! I Signature of P " ary Inst Date i i Signature of Permit Holder Date i u