Checkoff Sheet MS-2014-01140.tif 20" INTERNATIONAL RES IDENTI AL
C 17Y OF BLAIR REROOFING CHECKOFF SH
Return to Blair City Hall prior to Final Inspection
2x18 S '16 Street, Blair, NE 68008
B ecause of limitations caused by the infeasibility W'perform detailed inspections which would
interfere with reroofing work, please indicate compliance with the following requirements
rk 110, f • ills reroofing job.
permit
iristallation Date:
VIES NO
fM C3 The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
Q ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.23.1) i
(� STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
(� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
Q NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
I
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
i
Signature of ary rim Install Date
Date
40ignae of Permit Holder