Loading...
Checkoff Sheet MS-2014-01140.tif 20" INTERNATIONAL RES IDENTI AL C 17Y OF BLAIR REROOFING CHECKOFF SH Return to Blair City Hall prior to Final Inspection 2x18 S '16 Street, Blair, NE 68008 B ecause of limitations caused by the infeasibility W'perform detailed inspections which would interfere with reroofing work, please indicate compliance with the following requirements rk 110, f • ills reroofing job. permit iristallation Date: VIES NO fM C3 The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) Q ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.23.1) i (� STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) (� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 Q NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain I outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) i Signature of ary rim Install Date Date 40ignae of Permit Holder